// week 06 · day 02 · tuesday · the wording gets locked, then everything comes out

Locked, and unsignable until Friday.

The Contract's wording gets agreed and locked today - and then nobody touches it until Friday, when they sign it in front of their families. Today's job is to be certain: read it aloud, take the genuine out if you need it, and name your own hardest promise where only the tribe can hear it. Then six weeks of artifacts come out onto the tables and get sorted into done, needs a fix, and not showing this.

Contract locked Artifact review Guide signs too Reshoot decided ↓ Jump to Quest
01

The day's purpose

By 3:15 today the Contract's wording is locked and unarguable, every learner has named the promise they'll find hardest, and the studio has a written fix list for everything it intends to show on Friday.

// success criteria · 01

The wording is locked and understood

Read line by line, last objection taken seriously, then closed. If a learner can't say what's in it, the reading was too fast - and Friday is too late to find out.

// success criteria · 02

The guide named a promise too

Last, with a real answer. The guide signs alongside the learners on Friday for the same reason.

// success criteria · 03

"Not showing this" was a real option

At least one artifact can be withheld without argument. Makers get to decide what they exhibit.

02

Supplies & setup

Prepared before arrival

  • The Contract on good paper - large, legible across the room, wording exactly as the studio left it yesterday. Not tidied.
  • One personal copy per learner, in a sealed envelope addressed to them by name - prepared now, handed over at Exhibition once the wall copy is signed. It's in studio-contract.html and it's a good detail; it only works if the envelopes exist before Friday.
  • The signing copy prepared but kept back - the version that gets signed on Friday. Learners should see it exists; nobody signs it today.
  • Pens that feel like signing pens - put away until Friday.
  • Its permanent wall position decided and cleared
  • Every artifact from six weeks retrieved and ready to lay out - this is the big prep job of the week
  • Your own answer ready: which promise you'll find hardest

Materials

  • Camera - photograph the locked Contract before it goes to the signing copy
  • Sticky notes in three colors for DONE / NEEDS A FIX / NOT SHOWING
  • Screen ready to show the chosen Lip Dub take during the review
  • Board for the fix list
  • Table space - more than you think
03

Minute by minute

8:00 – 8:25 · 25 minarrival

Arrival & Free Time

Standard rhythm. Thinking Puzzle up by the cubbies.

8:25 – 8:30 · 5 mintransition

Settle

Standard rhythm.

8:30 – 8:50 · 20 minnon-negotiable launch

Morning Launch - what it means to put your name on something

Talking points, not a script. Hit these in your own words - the studio can tell the difference, and the ones that land are the ones you actually mean.

The opener (3 min):

Hold the Contract up. Don't read it yet.

"On Friday you're going to sign this, in front of your families. Today we lock the words, and today is the last day anybody can change them. First I want to be clear about what signing means, because people sign things all the time without meaning anything by it."

The core (10 min):

"Signing this doesn't mean you'll keep it perfectly. Nobody keeps a promise perfectly. It means you agree we can hold you to it - and that you can hold everybody else, including me."

Read the Contract aloud, slowly, all of it. Then the part that gives it teeth:

  • "If you break it, that's not a punishment - it's a compass check. Somebody says 'that's not what we agreed' and we sort it out."
  • "That works in every direction. If I break it, you say it to me. Out loud, in front of everyone. That's what signing buys you."

Then the genuine out, and mean it: "If there's a promise in here you don't think you can make, say so now and we'll talk about it as a studio. Signing something you don't agree with is worse than not signing - and Friday, with your families watching, is far too late to find out."

Hold a real pause. If nobody speaks, fine. If somebody does, that conversation is worth the morning.

The close (5 min):

"This afternoon we lock the wording, and then we start going back through everything you've made. If anything needs changing before Friday, this is when you say so. Including the film."

8:50 – 9:00 · 10 mindaily rhythm

Habit & Character Goals

Standard rhythm.

9:00 – 9:40 · 40 minmath time

Math Time

Standard rhythm. Schedule ownership continues: math sits inside it, so the block may move - what doesn't move is that it happens and the PWG opens first.

9:40 – 9:50 · 10 minexit ticket

Rocket Math

Standard rhythm.

9:50 – 10:20 · 30 minsnack

Snack

Standard rhythm.

10:20 – 11:20 · 60 minela block

ELA Block - software + Exhibition writing

  • 10:20–10:50: ELA software block.
  • 10:50–11:20: Exhibition writing finished and practiced aloud with a partner. Reading it to one person today is what makes reading it to a family possible on Friday.
11:20 – 12:00 · 40 mintuesday variable

Extended ELA + Typing Club

  • 11:20–11:50: writing block.
  • 11:50–12:00: Typing Club, hard cutoff at 12:00.
12:00 – 1:00 · 60 minlunch

Lunch

Standard rhythm.

1:00 – 1:50 · 50 mincivilization

Civilization

Confirm Civ curriculum direction.
1:50 – 2:40 · 50 minquest · btt

Quest - locking the Contract, then the artifact review begins

// purpose

The Contract gets its final wording today so that Friday is a ceremony rather than a negotiation. The vulnerable part - naming the promise you'll personally find hardest - happens here, in front of the tribe only. What happens in front of families on Friday is the signature. Then the week's actual work starts: going back through six weeks of artifacts and deciding, as their makers, what's finished and what isn't.

1 - Locking it (20 min):

  1. Contract up large where everyone can read it. Last call on wording - read it through once more, line by line, and take any final objection seriously.
  2. Then it's locked. Say that plainly: "That's the wording. Nobody changes a word after today, including me."
  3. Then, one at a time, everyone watching - and this is the part that matters: each learner says "the promise I'll find hardest is ___." No signing yet, just the sentence.
  4. The guide goes last, with the same sentence and a real answer. Skip this and the Contract is a rulebook; do it and it's an agreement.
  5. Why here and not Friday: naming your own weak point is a vulnerable thing, and it belongs to the tribe. Doing it in front of thirty parents would make it a performance. Friday gets the signature; Tuesday gets the honesty.

2 - The artifact review, round one (30 min):

Everything the studio has made comes out and gets laid around the room. Learners walk it with sticky notes and mark each item one of three ways:

  • DONE - ready for families exactly as it is.
  • NEEDS A FIX - nearly there; say specifically what.
  • NOT SHOWING THIS - and say why. This is allowed and it should be said out loud that it's allowed.

What goes out: Standard of Excellence v1 and v2 · Rules of Engagement · the Studio Manual draft (it gets compiled properly tomorrow, but the offcuts should be on the table today so nothing is missing) · both Trading Card sets · PWG v1 and v2 · Spark journals · boat photos · the Lip Dub banner · the storyboard · both mirrors · the chosen Lip Dub take. Plus, if the studio ran them: the Portrait Wall and the Chain Reaction film - both are Week 4 backup activities, so they may or may not exist. Don't leave a gap on the table for something that was never made.

Then the question that has to be asked out loud: "Does anyone want another go at the film?" Ask it plainly and without steering. A studio that quietly wanted another go and never got asked will remember that.

// give them the real terms before they vote

A reshoot costs the fix list, and only Wednesday is available

The honest position, and they should hear it before the hands go up: "If we reshoot, it happens tomorrow afternoon and it costs us the fix list. Thursday is the room and it can't move. So the real question is whether the film is worth more to you than the wall."

Why Thursday genuinely isn't available. Thursday is the room build plus the technical rehearsal - and a film that changes on Thursday invalidates the check that matters most on that day, which is playing it on the actual screen, at volume, in the actual room. One Wednesday Quest block is a real second attempt. Two days is not on offer.

Decide it now, together, rather than letting it fester as a private disappointment - and if they vote for it, say out loud which fix-list items are being given up.

Carry forward: The locked wording goes up on the wall today so everyone can read it all week; the signed copy replaces it on Friday and stays there all year. The fix list drives Wednesday and Thursday.

Note the time: if the ten minutes have been handed back, this block runs 1:50–2:50.

2:40 – 3:00 · 20 min20 min during btt

Studio Maintenance

Standard rhythm. Artifacts stay out - the room is a workshop for the rest of the week.

If the ten minutes have been handed back (see W5D1) - this block is 2:50–3:00 and Quest ran to 2:50.

3:00 – 3:10 · 10 mindaily ritual

Character Callouts

Callouts around the signing - particularly whoever named a genuinely hard promise rather than a safe one, and anyone who spoke up at launch about a promise they couldn't make.

3:10 – 3:15 · 5 minclosing

Reflection

One question: "Which promise will be hardest in November?" Not this week - November. Different answer.

3:15 – 3:30 · 15 minpickup

Pickup

Send-off by name.

04

Go deeper · stretch · empower

For learners ready to lead

  • Ask a learner to read the Contract aloud at launch rather than the guide. Six weeks of work read in a learner's voice lands differently - and whoever does it today is the obvious candidate to open the reading on Friday.
  • Someone should own the Contract's display - how it hangs, what goes beside it, how it looks Friday.
  • The artifact review needs someone collating the fix list into something workable by Thursday. Unglamorous and genuinely load-bearing.

For learners who need more scaffolding

  • "The promise I'll find hardest is ___" is a sentence frame on purpose. Post it so nobody invents words while everyone watches.
  • Friday's ceremony has each learner reading one line of the Contract aloud. Assign lines today, not Friday morning, and let anyone who wants to practice theirs do so.
  • A learner who doesn't want to say anything while signing can sign in silence. Participation is signing; the sentence is optional.
  • Three sticky-note categories keeps the review concrete. "What do you think of this?" would not.

For specific learner needs

  • Signing in front of families on Friday is exposing. Say today that the order is negotiable and that anyone can go first or last - it gives them four days to stop worrying about it.
  • If a learner genuinely can't commit to a promise, that's a real conversation and not defiance. Take it seriously; it may improve the Contract.
  • Some learners will want to withhold work they're not proud of. Honour that without negotiation - and check privately whether a fix would change their mind.

For the guide

  • Name your own hardest promise today, and sign alongside them on Friday. A guide who exempts themselves has written a rulebook and called it a contract.
  • The pause at launch has to be genuine, and today is the last chance for it. An objection raised on Friday in front of families cannot be handled well by anybody.
  • Ask the reshoot question plainly and without steering. A studio that quietly wanted another go and never got asked will remember that.
  • Tonight: turn the sticky notes into one fix list. Thursday runs off it.
05

Parent communication today

Talking points for this week's email. Drop these into an AI assistant along with two or three live notes from your actual week - a name, a moment, something that surprised you - and it'll give you a draft in your own voice. The specifics are what make it land; the structure below is just the scaffolding.

The draft underneath is an example of the shape and the tone, not a template to send as-is. A parent who gets the same email as every other parent can tell.

// example draft · a shape, not a template

Subject: The Contract is locked - they sign it on Friday

Hi families,

The Studio Contract has been built in pieces since the first week - drafted, argued over, cut down, rewritten. Today the studio locked the wording. Nobody changes a word from here, including me.

Then, one at a time with everyone watching, each learner said a single sentence: the promise I'll find hardest is ___. I went last, with a real answer of my own. We did that part today, in the studio, rather than on Friday - naming your own weak point is a vulnerable thing and it belongs to the tribe, not to an audience.

They sign it at Exhibition on Friday, in front of you. Each learner reads one line of it aloud, then everyone signs, and it goes on the wall for the year.

Then everything they've made in six weeks came out onto the tables, and they went round marking each thing done, needs a fix, or not showing this. That last one is a real option - they made these things, so they decide what gets exhibited.

- [your name]

← previousDay 1 · The Six-Week Mirror